Home / Minnesota / Mississippi River at Aitkin, MN
Mississippi River at Aitkin, MN
USGS 05227500 · read Nov 18, 11:30 PM CST · Provisional
Showing the most recent data this page has — read Nov 18, 11:30 PM CST.
Mississippi River at Aitkin, MN is at 8.37 ft and falling — down 0.12 ft in the last 24 hours, and 3.63 ft below action stage. Flow is 3,980 ft³/s. Reading 3 hours ago.
Last 3 days
In this view — high 8.69 ft · Nov 16, 12:45 AM CST · low 8.37 ft · Nov 18, 10:45 PM CST
The level now is 3.63 ft below action stage (12.00 ft).
Flood stages & what happens
No flooding 3.63 ft below action stage (action stage is 12.00 ft).
| Major flooding | 18.00 ft |
| Moderate flooding | 15.00 ft |
| Minor flooding | 13.00 ft |
| Action stage | 12.00 ft |
| ▸ The river is here — 8.37 ft | |
Flood stages are the National Weather Service stages published for this gauge through NWPS, in feet of gage height.
NWPS forecast: a peak of 9.50 ft is forecast in the current outlook (valid to 2026-11-10).
What floods, stage by stage (National Weather Service)
- 26.00 ft — The BNSF Railroad track becomes impassable.
- 25.00 ft — The transformer station becomes inoperable.
- 23.50 ft — The power and water plants in Aitkin become inoperative.
- 21.00 ft — The power plant at Aitkin needs emergency protection.
- 20.50 ft — Portions of Highway 169 northeast of Aitkin become impassable.
- 19.00 ft — The transformer station needs emergency protection.
- 18.00 ft — The Aitkin sewage plant becomes inoperative.
- 17.00 ft — Pumping begins at the wastewater treatment plant. Sandbagging begins at Aitkin city transformer. Water tops the levees on the North side of Aitkin.
Highest crest in the NWPS historic-crest list: 22.49 ft on 1950-05-20.
Flood of record
Flood of record: 20,000 ft³/s on May 20, 1950 — highest since 1888 · gage record begins 1888
| # | Water year | Date | Peak flow |
|---|---|---|---|
| 1 | 1950 | May 20, 1950 | 20,000 ft³/s |
| 2 | 2012 | June 28, 2012 | 15,200 ft³/s |
| 3 | 1975 | May 3, 1975 | 14,500 ft³/s |
| 4 | 1969 | April 23, 1969 | 14,400 ft³/s |
| 5 | 2001 | April 28, 2001 | 14,200 ft³/s |
Annual peak streamflow (USGS, parameter 00060) — the maximum instantaneous discharge of each water year, October 1 to September 30.
About this gauge
Drainage area 6140.0 mi² · Aitkin County, Minnesota · 46.540706, -93.707429 · NWPS gauge ATKM5 · Forecast office: Duluth
Official pages: USGS monitoring location 05227500 · NWPS gauge ATKM5
Nearby gauges
| Gauge | Level | Trend | Dist. |
|---|---|---|---|
| Mississippi River Diversion near Aitkin, MN | 6.46 ft | Falling | 4 mi |
| Rice River at Nature Ave near Kimberly, MN | 9.72 ft | Steady | 11 mi |
| Pine River near Mission | 36.70 ft | — | 15 mi |
| Willow River near Palisade | 7.55 ft | — | 17 mi |
| Mississippi River at Brainerd, MN | 8.01 ft | Steady | 25 mi |
| Pine River near Jenkins | 8.12 ft | — | 30 mi |
Get an email when this gauge reaches flood stage
We’ll email when this gauge crosses its National Weather Service flood stage — and once more if it climbs into a higher flood category.
Alerts are not an official warning — for official warnings check the National Weather Service.
If our reading feed is stale we send nothing rather than guess. We will never sell or share your email address.