Home / Maine / E Br Penobscot River below Grand Lake Matagamon
E Br Penobscot River below Grand Lake Matagamon
USGS 01029100 · read Nov 19, 2:45 AM EST · Provisional
Showing the most recent data this page has — read Nov 19, 2:45 AM EST.
E Br Penobscot River below Grand Lake Matagamon is at 2.44 ft and steady — unchanged in the last 24 hours, and 5.06 ft below action stage. Flow is 173 ft³/s. Reading 4 hours ago.
Last 3 days
In this view — high 2.46 ft · Nov 16, 8:45 AM EST · low 2.44 ft · Nov 17, 12:45 PM EST
The level now is 5.06 ft below action stage (7.50 ft).
Flood stages & what happens
No flooding 5.06 ft below action stage (action stage is 7.50 ft).
| Minor flooding | 8.50 ft |
| Action stage | 7.50 ft |
| ▸ The river is here — 2.44 ft | |
Flood stages are the National Weather Service stages published for this gauge through NWPS, in feet of gage height.
What floods, stage by stage (National Weather Service)
- 9.50 ft — Similar flooding to December 19th, 2023 with extremely dangerous flows greater than 6800cfs downstream from Grand Lake Matagamon Dam to Spencer Rips. All campsites inundated with 1 to 2 feet of moving water upstream of the Grand Lake Road bridge on the left bank side of the river. Several campsites downstream of Grand Lake Road bridge flooded to the Katahdin Woods and Waters Monument on the right bank side of the river.
- 8.50 ft — Minor flooding is occuring with extremely dangerous flows greater than 5800cfs from the Grand Lake Matagamon Dam. Campsites on the left bank upstream of the Grand Lake Road bridge will become inaccessible. Campsites begin flooding downstream of the bridge on the right bank. Campsites will be flooding downstream in the Katahdin Woods and Waters Momument land including areas from The Oxbow to Grand Pitch.
- 7.50 ft — Increasingly dangerous flows being discharged from the Grand Lake Matagamon Dam upstream. Water will begin flooding low lying campsites on the right bank downstream of the Grand Lake Road bridge. Water will be approaching the campsites on the left bank upstream of the Grand Lake Road bridge.
Highest crest in the NWPS historic-crest list: 9.60 ft on 2023-12-19.
Flood of record
Flood of record: 3,960 ft³/s on April 30, 2025 — highest since 2024 · gage record begins 2024
| # | Water year | Date | Peak flow |
|---|---|---|---|
| 1 | 2025 | April 30, 2025 | 3,960 ft³/s |
| 2 | 2024 | May 20, 2024 | 1,330 ft³/s |
Annual peak streamflow (USGS, parameter 00060) — the maximum instantaneous discharge of each water year, October 1 to September 30.
About this gauge
Drainage area 493.0 mi² · Penobscot County, Maine · 46.1343611, -68.7939056 · NWPS gauge GLMM1 · Forecast office: Caribou
Official pages: USGS monitoring location 01029100 · NWPS gauge GLMM1
Nearby gauges
| Gauge | Level | Trend | Dist. |
|---|---|---|---|
| Seboeis River near Shin Pond, Maine | 4.47 ft | Steady | 8 mi |
| Ripogenus Dam Discharge | 943.00 ft³/s | — | 26 mi |
| East Branch Penobscot River at Grindstone, Maine | 4.54 ft | Steady | 30 mi |
| Aroostook River near Masardis, Maine | 3.11 ft | Steady | 34 mi |
| Dolby Dam Discharge | 1,321.00 ft³/s | — | 36 mi |
| Wytopitlock Stream near Wytopitlock Maine | 2.61 ft | Steady | 42 mi |
Get an email when this gauge reaches flood stage
We’ll email when this gauge crosses its National Weather Service flood stage — and once more if it climbs into a higher flood category.
Alerts are not an official warning — for official warnings check the National Weather Service.
If our reading feed is stale we send nothing rather than guess. We will never sell or share your email address.